top of page

Proposal  >  Phase 3

Phase 3 - Bradford bridge to the Allerford Inn

After opening up sections of the Greenway at either end, where they can be of particular use for local trips. The next task is to reach Bradford-on-Tone which would be a very attractive stopping off point.. To start with there is a most substantial section of canal embankment after its rise at the 19 foot high Allerford Lift. The West Dean Way follows closer to the riverside and is prone to flooding so if it is possible to negotiate a route along the hedge line of the canal we could build a path above most flood levels. Greenways and Cycleroutes has recently completed just such a path across the flood plain of the River Thame at Aylesbury and we envisage something similar here.

 

At its southern end a crossing of the open field would give a direct access to the medieval bridge over the river and the village

phase 3.png

© 2023 by Grand Western Greenways Association

Grand Western Greenway is a Community Interest Company registered at Companies House 15938941.

  • Facebook
  • Instagram
paypal.png
Taunton-TC-Logo-1024x454.png.pagespeed.ce.sX0MqTiX-n.png
WTC_Logo-Heading-Wellington-Town-Council-serving-Wellington-Rockwell-Green-page-001-1-scal
Greenways Ltd.png
bottom of page