The Greenway (proposed) Route

  • charles3015
  • 14 minutes ago
  • 3 min read

In a perfect world, we could draw a line on a map and, after a bit of to-ing and fro-ing, build a beautiful path through the countryside to be enjoyed by all as they walk wheel and cycle between Wellington and Taunton.


Of course, this is a far from perfect world and without that line on the map there is no starting point and nothing to which we and hundreds of others can aspire.


In this post I want to talk about a route through the Tone Valley from Tonedale in Wellington to Taunton Station. In conjunction with Greenways and Cycleroutes Ltd and the renowned path builder John Grimshaw CBE, we have studied an outline route with some options.


Our goal has always to do more than build a linear route between Wellington and Taunton. We want to connect several communities along the way and have mapped out possible routes to bring Wiveliscombe, Langford Budville, Milverton, Nynehead, Hillfarrance, Oake, Bradford on Tone, Bishops Hull and Norton Fitzwarren on to the main route through a series of 'behind-the-hedge' paths and quiet lanes. By connecting the Greenway to these communities, it will small communities to each other and to Wellington and Taunton in turn.

Map showing connections from rural communities to the Greenway. The inset shows some of the route options to Musgrove Par Hospitaland Taunton College across Roughmoor.
Map showing connections from rural communities to the Greenway. The inset shows some of the route options to Musgrove Par Hospitaland Taunton College across Roughmoor.

I can imagine a few sharp intakes of breath at the scope of the project, but we have to remember that one third of all journeys are done by active means and that these paths could improve the lives of a population in excess of 100,000 (Taunton Local Community Network - 74,000. Wellington and Wiveliscombe Local Community Network - 27,000 (Somerset Council))


Many people want to create active travel routes. In Somerset there are campaigns everywhere, all with laudable goals to offer a traffic-free piece of infrastructure to serve the walker, wheeler, and cyclist. The Government is more committed to seeing this happen in England with the publication of a draft Cycling and Walking Investment Strategy. Although by no means perfect, it refers to the potential success of projects that are “coherent, connected, consistent and accessible to all” and should link to key destinations such as rail and bus stations, hospitals, and schools.


It is hard to imagine a project that better fits this description than the Grand Western Greenway. If you want to see an interactive map of the route pictured above, see our website (below)


Let us have a quick walk-though starting in Wellington. Bear in mind, this is entirely dependent on landowner permissions and planning permissions!


Tonedale (phase 1)

When Network build the Wellington Station starting in 2026, they will almost certainly build a 'haul-road' from Tonedale to the station site on the north side of the railway. They have agreed to leave that in place rather than remove it as they would normally. West of England Developments have planning application before Somerset Council to build a number of homes in this location, and their Active Travel Plan (every application has one) involves incorporating this haul-road into it. After the station, we would continue along the north side of the Nynehead boat lift to the Nynehead Road to connect with the existing public right of way to the East Nynehead Road.


We would then hope to follow the route of the defunct Grand Western canal to Tone Green and continue along the north side of the railway to the Oake / Bradford on Tone Road. This is the only practical rail crossing which, while not perfect, could accommodate safe passage from the north to the south.


We follow the railway along the south side to Allerford and on into Silk Mills. Wessex Water have given us permission to incorporate the access to their pumping station at Silk Mills to get us under the bridge. From there we would pick up the existing bridleway across Frieze Hill to Staplegrove Road.


The route to the station already exists along Trenchard Way, although it would be desirable to incorporate the paths (upgraded) over Roughmoor to the hospital and College.


From the station to the centre of town, a new route is already under construction as part of the Garden town investment and will see a much-improved bridge being installed (hopefully in 2026) at the Morrisons / Brewhouse juncture.


Interesting? Raises more questions than it answers? Then why not join us at a Public Meeting in Wellington on 24th January 2 - 4pm. It will be in the 1st Wellington Scout HQ, 6 Fore Street (behind the Co-Op)







 
 
 

Recent Posts

See All
Greenway Update

Railway Station We can't even begin to express our joy at the announcement that Wellington will have its railway station reinstated! For...

 
 
 

Comments


© 2023 by Grand Western Greenways Association

Grand Western Greenway is a Community Interest Company registered at Companies House 15938491

  • Facebook
  • Instagram
paypal.png
Taunton-TC-Logo-1024x454.png.pagespeed.ce.sX0MqTiX-n.png
WTC_Logo-Heading-Wellington-Town-Council-serving-Wellington-Rockwell-Green-page-001-1-scal
Greenways Ltd.png
bottom of page